Amsterdam B. at Home

Discover more

View all our projects

Discover more

View all our projects

This project offers apartments, offices, and shops, transforming the Schinkelkwartier into a vibrant urban neighborhood.

Surface

30.775 m²

Certificates

Construction period

2025-2028

Type of project

Living

Number of rooms

30

Number of livings

300

Project description

The B. at home project in the Schinkelkwartier, Amsterdam, covers 30.775 m² and includes 300 apartments, of which 30 are hotel rooms, 1.968 m² of office space, 1.508 m² of commercial areas, and a basement of 4.178 m² with parking facilities. A residential tower reaches a height of 55 meters, making it a distinctive landmark in the neighborhood. Construction starts in 2025, with pile driving work in February and the installation of a tower crane after the summer holiday. In March 2026, the ground floor slab will be poured, and the upper structure will begin, constructed with a concrete skeleton and façades made of red sandwich concrete panels. The delivery in 2028 marks an important contribution by Pleijsier Bouw to the transformation of the Schinkelkwartier into a modern urban district.

Project updates

April 2026

In April, we started installing the sandwich columns and lintels on the ground floor.

Following the initial installation of the columns, we also began reinforcing, formworking, and pouring the first concrete walls.

In addition, we started installing the temporary supports for the construction of the first floor.

March 2026

All ground floor slabs, the ramp slab, and the transformer room slabs have now been poured. In March, the sheet piles surrounding the basement were removed, making the construction site significantly more spacious and organized.

The first tower crane has been climbed to a hook height of 80 metres, and the second crane has now also been installed.

Let the first Hibex elements arrive: construction above ground is now truly about to begin. The visible structural work is coming!